Types of chimneys
Contents |
[edit] Introduction
In traditional construction, a chimney is a structure consisting of a wall or walls enclosing one or more flues. Scottish Building Standards define a chimney as: ‘…a structure enclosing one or more flues, but not a flue pipe, and including any openings for the accommodation of a combustion appliance, but does not include a chimney terminal.’ A chimney terminal is another term for a chimney pot, cowl or other structure that finishes off the chimney top.
[edit] Materials
Chimneys can be identified by the materials used in their construction. Common types include:
Brick. This common type of chimney found in residential construction can tolerate temperatures up to approximately 980C. However, since bricks are porous, they can deteriorate under certain climate conditions, and repointing can be necessary to prevent rainwater penetration.
Stone. Also porous, but it can be more expensive than brick. It is generally more difficult to build with stone when the shapes are irregular. Again, repointing can be necessary.
Concrete block. This is an easy to use and affordable material for chimney construction, and offers flexibility in terms of colour.
Metal. Metal is a good conductor of heat, although it can warp at high temperatures and must be lined for protection. Typically flues are made from metal.
Pre-fabricated materials. These factory built structures can be made to certain specifications (such as double-walled, air-cooled and so on).
Wood burning stovepipe chimneys. These vertical structures are attached to stoves and go through the ceiling and out through the roof. Due to the high temperatures of wood burning stoves, these chimneys must be able to withstand high heat. This may be referred to as a flue.
[edit] Chimney classes
[edit] Class 1
Traditional masonry chimneys found on older buildings (built before the 1960s) tend to be designated as Class 1. These chimneys are positioned on an internal or external wall and can contain more than one flue for more than one fire. However, fires cannot share the same flue. These chimneys tend to require liners, due to their age.
[edit] Class 2
Chimneys outfitted with pre-fabricated flues are categorised as Class 2. These chimneys can sometimes be identified by a metal chimney terminal. They are more commonly found in newer properties.
[edit] Related articles on Designing Buildings
Featured articles and news
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.